Capability Maturity Model Integration (CMMI) level 5 affirms that the software developing firm is at a stage of _______. 

This question was previously asked in
JKSSB JE Mechanical 02 Nov 2021 Shift 1 Official Paper
View all JKSSB JE Papers >
  1. having adhoc uncontrolled processes 
  2. continuous process improvement
  3. using statistical tools in the management of processes and projects
  4. having several well defined and documented standard processes

Answer (Detailed Solution Below)

Option 2 : continuous process improvement
Free
JKSSB JE Civil RCC Structures Mock Test
0.8 K Users
20 Questions 20 Marks 20 Mins

Detailed Solution

Download Solution PDF

Concept:

Capability Maturity Model (CMM) is the strategy for improving the software process irrespective of the actual life cycle model used. It has 5 different level. Each level and its basis features are listed below :

  • Initial (Maturity level 1) - Adhoc
    • At this level, processes for developing software are Adhoc & not well defined.
  • Repeatable (Maturity level 2) - Basic Project Management
    • This level focuses on project management policies establishment.
  • Define(Maturity level 3) - Process Definition
    • Documentation of procedures & standard guidelines are the major focus of this level.
  • Managed (Maturity Level 4 ) - Process Measurement
    • This level sets quantitative goals for software products as well as for software processes.
  • Optimizing (Maturity level 5) - Continuous process Improvement
    • Using quantitative feedback, this level focuses on continuous process improvement so option 2 is correct.
Latest JKSSB JE Updates

Last updated on Jul 1, 2025

-> JKSSB Junior Engineer recruitment exam date 2025 for Civil and Electrical Engineering has been rescheduled on its official website. 

-> JKSSB JE exam will be conducted on 31st August (Civil), and on 24th August 2025 (Electrical).

-> JKSSB JE application form correction facility has been started. Candidates can make corrections in the JKSSB recruitment 2025 form from June 23 to 27. 

-> JKSSB JE recruitment 2025 notification has been released for Civil Engineering. 

-> A total of 508 vacancies has been announced for JKSSB JE Civil Engineering recruitment 2025. 

-> JKSSB JE Online Application form will be activated from 18th May 2025 to 16th June 2025 

-> Candidates who are preparing for the exam can access the JKSSB JE syllabus PDF from official website of JKSSB.

-> The candidates can check the JKSSB JE Previous Year Papers to understand the difficulty level of the exam.

-> Candidates also attempt the JKSSB JE Mock Test which gives you an experience of the actual exam.

Get Free Access Now
Hot Links: teen patti gold online teen patti - 3patti cards game downloadable content teen patti boss teen patti winner teen patti refer earn